Benchreads

How to become an operations consultant · Module 01 of 6 · 10 minutes

Seeing processes: value stream, lead time, Little’s Law

How to make a process visible from customer order to delivery, measure lead time and inventory, and why Little’s Law applies almost everywhere.

Operations consulting starts with looking. Before you talk about automation, lean or new software, you have to understand how work actually flows through a company. Usually it turns out that an order spends most of its time waiting and is worked on for only a small part of the time. This module gives you the tools to make that visible and measurable.

01Drawing the value stream

In “Learning to See” in 1998, Mike Rother and John Shook described value stream mapping. You draw the entire route of a product or order from ordering to delivery, with all process steps, the inventory between them and the information flows. For each step you note processing time, changeover time, availability, error rate and the inventory in front of it.

It is important to map the process on site, not from manuals or organisation charts. The actual flow often differs considerably from the one described: there are loops, rework, interim storage and coordination that are documented nowhere. The principle of going to the place where the work happens comes from the Toyota Production System, where it is called gemba.

02Processing time and lead time

Lead time measures how long an order takes from receipt to completion. Processing time measures how long it is actually worked on. In many processes, the ratio between the two is alarmingly small: an order with a lead time of ten days may be worked on for three hours. The rest is waiting in queues, storage and in-trays.

This insight changes the direction of improvement. Reducing processing time by ten percent gains little. Halving the waiting time shortens lead time drastically. That is why process improvement concentrates first on waiting times, inventories and hand-overs.

  • Lead time: receipt to completion
  • Processing time: actual work on the order
  • Waiting time: the difference between the two
  • Flow efficiency: processing time divided by lead time

03Little’s Law

In 1961, in the journal Operations Research, John Little proved a relationship that now bears his name: the average inventory in a system equals throughput multiplied by the average lead time. Rearranged, this means: lead time equals inventory divided by throughput.

The formula holds remarkably generally, for factories as well as loan applications, hospital beds or software tasks, as long as the system is stable on average. If 600 orders are in the process and 50 are completed per day, the average lead time is 12 days. If you want to halve it, you must either halve the inventory or double the throughput. The first is usually much easier.

04Bottleneck and utilisation

Every process has one step with the lowest capacity. It determines the throughput of the whole system. Inventory piles up in front of it, and the following steps wait behind it. When you draw the value stream, you can usually spot the bottleneck by the largest inventory in front of it.

A widespread misconception is that all resources should be fully utilised. Queueing theory shows that waiting times rise not linearly but steeply at high utilisation, especially when arrivals and processing times fluctuate. A process in which every step is 95 percent utilised almost inevitably has long waiting times.

05From current state to future state

After the current state, you draw a future state: what would the process look like if orders flowed? Typical elements are fewer hand-overs, smaller batch sizes, one-piece processing, fixed rhythms and clear rules for priorities. The future state is not an ideal picture but a target for the next six to twelve months.

The gap between the two produces an action plan. Good plans start with a few visible improvements at the bottleneck and at the largest inventories. They measure lead time, inventory and throughput regularly, so that progress is visible to everyone.

Example

Loan processing at a regional bank

A bank takes an average of 15 working days to decide on a business loan. The value stream shows seven hand-overs between sales, analysis, credit back office and approval. Pure processing time is about five hours. There are 300 applications in the process and 20 are decided per day, which according to Little’s Law gives exactly the 15 days.

The bank introduces an initial check that immediately returns incomplete applications, limits the number of open applications per analyst and combines analysis and back office for standard cases. Inventory falls to 140 applications and lead time to around seven days. The example is invented and the figures are illustrative.

Typical mistakes

  • Mapping processes from manuals instead of on site.
  • Optimising processing time and ignoring waiting time.
  • Aiming for full utilisation of all resources.
  • Trying to cut lead time without limiting inventory.

+Exercise

Draw the value stream of a process you know, such as a travel expense claim or a customer enquiry. Estimate the processing time and waiting time for each step. How high is the flow efficiency, and where is the bottleneck?

+Self-check

QuestionWhat does Little’s Law say?

The average inventory equals throughput times the average lead time. It follows that lead time equals inventory divided by throughput.

Start the test: 30 questions

QuestionWhy does process improvement concentrate first on waiting times?

Because processing time often makes up only a small part of lead time. Reducing waiting times shortens lead time much more.

Start the test: 30 questions

QuestionWhy is full utilisation of all resources problematic?

Because waiting times rise steeply at high utilisation and fluctuating demand.

Start the test: 30 questions

Module test

30 questions with instant feedback and explanations. At 80 percent or more, you have it.

Start the test

+Keep learning

Amazon links on English pages carry no affiliate tag.

Sources

  • Mike Rother, John Shook: Learning to See, Lean Enterprise Institute 1998
  • John D. C. Little: A Proof for the Queuing Formula L = λW, Operations Research, 1961
  • Wallace J. Hopp, Mark L. Spearman: Factory Physics, Waveland Press, 3rd edition 2008
How to cite this page

APA (7th edition)

Benchreads. (2026). Seeing processes: value stream, lead time, Little’s Law. Learning path: How to become an operations consultant. Retrieved 25 November 2026, from https://benchreads.com/en/learning-paths/become-an-operations-consultant/seeing-processes-value-stream-lead-time-littles-law/

Benchreads is a secondary source. For academic work, also cite the original sources named in the text. You are welcome to link to this page in course materials.

Last updated: 25 November 2026. Carefully researched, but without guarantee. Not legal, tax or investment advice. Disclaimer